Case Study: Casthouse Cooling Tower System
DHD was engaged to design and install a cutting-edge cooling system for a new billet casting line at a leading aluminium casting facility.
Case Study: Metal Processing Tower System
DHD was engaged to design and install a cutting-edge cooling system for an existing annealing line at a major special metal manufacturing facility.
Case Study: Office Building, South Wales
DHD was engaged to refurbish two GOHL cooling towers at an office building. The fill pack and drift eliminators had deteriorated over time, and the internal surfaces required repainting due to corrosion.
Case Study: Automotive Industry, London Area
DHD was engaged to refurbish two Carter Buckingham Cooling Towers at an engine manufacturing plant. The existing fill pack and drift eliminators had deteriorated, and the cooling tower’s internal surfaces required repainting due to corrosion.
Case Study: Domestic Products Manufacturer, South West
DHD was engaged to replace the bearings on two Evapco Closed Circuit Cooling Towers at a consumer goods manufacturing plant.
Case Study: Food Manufacturer, North East
DHD was engaged to upgrade the fill pack system in BAC Series 3000 Cooling Towers at a food manufacturing plant.
Case Study: Power Generation, North West
DHD was engaged to clean a large timber Cooling Tower at a Power Generation Plant in the North West.
Case Study: Paper Manufacturer, Scotland
DHD was engaged to repack a two-cell field-erected Marley Cooling Tower at a paper mill.
Case Study: Plastics Manufacturer, North West
DHD was approached by a plastics manufacturer experiencing repeated failures in their belt-driven fan cooling towers.
Case Study: KTS Wires Cooling Tower Installation
DHD was engaged to provide a new cooling tower for KTS Wires in Leeds.
Case Study: Chemical Manufacturer, Midlands
DHD was engaged to replace an aging Hamon timber field-erected cooling tower.
“DHD Cooling delivered significant energy savings and improved efficiency. Their expertise, from design to installation, exceeded expectations. The new system has reduced operational costs and downtime while enhancing overall production performance. We highly recommend their services.”
Martin Coomber, MD, ACT Services and Maintenance.
“I would like to take this opportunity to express our appreciation for the excellent work carried out during the recent refurbishment of our cooling towers. The project has been a resounding success, and your team’s skill, professionalism, and dedication have been instrumental in achieving this result.”
Steve Olverman, Project Engineer, Dr Reddy’s